0

Notification for failure of scheduled model refresh?

Is there any way to send a notification when a schedule model refresh fails?

8 replies

null
    • "making the sophisticated simple"
    • AviPerez
    • 4 yrs ago
    • Reported - view

    Yes. If you are in 2020, turn on "Master Flows". In the widget menus on the left, you'll see options for sending email and SMS messages as part of the flow (if messaging has been enabled in the admin).

    • Kim_Southwood
    • 4 yrs ago
    • Reported - view

    how do I pass the process condition (success/failure) in the email?

      • "making the sophisticated simple"
      • AviPerez
      • 4 yrs ago
      • Reported - view

      Kim Southwood You can set the conenctor to "success" or "failure", and attach the appropriate email on either end.

      if you turn on the SMS system, it can also go to your phone.

      • Kim_Southwood
      • 4 yrs ago
      • Reported - view

      Avi Perez Avi … before another Pyramid source pointed this out, I searched the online help and Q&A, but couldn't find anywhere this is documented … is there another point of documentation where I can find things like this?

      • "making the sophisticated simple"
      • AviPerez
      • 4 yrs ago
      • Reported - view

      Kim Southwood The published help on this set of topics is light. There is a big upgrade in help coming in a few weeks which starts the process of covering all these items in far greater detail. Unfortunately, help specifically on "Model" is still a couple months away. 

      In the meantime, use the forum for all your questions that help doesn't explain.

    • Kim_Southwood
    • 4 yrs ago
    • Reported - view

    OK, was notified of the Required Status property of the data flow connector to direct the branching

      • fadiel_Ras
      • 4 yrs ago
      • Reported - view

      Kim Southwood how are you? please let me know where you set the success/failure condition? I'm in the Master flow but can't see it - thank you!

      • Kim_Southwood
      • 4 yrs ago
      • Reported - view

      Fadiel Ras  you actually have to click on the connector line between the Data Flow process and the next step and you can select the value (Success/Failure/Any) for the Required Status property.  The fact that the connector lines have a property setting in the Master Flow level is not yet documented in the online Help area.  I was lucky to have our assigned support rep point it out.

Content aside

  • Status Answered
  • 4 yrs agoLast active
  • 8Replies
  • 52Views
  • 3 Following